Things have slowed down a bit on the bathroom remodel front, but we have added a lot more of the details to the master bathroom such as
- A mirror - it's adjustable!
- A cupboard over the toilet
- Trim around the wall cupboard
- Towel hook by the sink
- Standing toilet paper holder
Things that still need to be done include
- Finishing the edging of the built-in shelf above the wall cupboard
- Grouting the window sill and built-in-shelf
- Sealing the crown molding and trims
- Touch-up painting
- Towel rack for large towels
Now, if we could only find the time to finish the main bathroom...
No comments:
Post a Comment